Master Drilling has been active in Saudi Arabia since 2021.
Highlights of activities
Master Drilling is proud to announce the successful completion of the first hole for the Neom City project in Saudi Arabia with a diameter of 6.65 meters. Our next drilling operation will be a significant undertaking, with a hole depth of 166 meters and a diameter of 6.65 meters. In addition to our work on the Neom City project, we have successfully completed several other raise boring operations at Jabal Sayid. In 2021, we raised bored a hole to a depth of 295 meters with a diameter of 4.5 meters. We followed this up with another successful project in 2023, where we raised bored a hole to a depth of 235.4 meters with the same diameter of 4.5 meters.