CHALLENGE:

Extension of the Rio underground metro, requiring three new ventilation shafts (two 4.1m in diameter at a depth of 100m, and one 5m in diameter at a depth of 100m)

RESULT:

  • Project completed on time, within budget and without deviation
  • 100% safety record achieved during the duration of the project

SOLUTION:

Master Drilling addressed the following project challenges:

  • Pilot holes had to be drilled without deviation
  • Restricted access to site was resolved through the construction of custom-made ramps so that drilling machines could be transported to the appropriate areas
  • Operating hours were reduced to between 08:00 am and 22:00 pm, and noise levels had to be kept to a minimum as a result of surrounding residential areas
  • Effective stakeholder engagement with all parties involved and an emphasis on effective environmental management procedures

PROJECT STATS:

Type of drilling typeRaise boring
MachineRaise bore rig 009H
Excavation depth (m)3 x 100m holes
Diameter2 x 4.1m
1 x 5m
GeologyCompetent
ContractorOdebreght
Project OwnerRio Metro
ENERGY: ITUANGO HYDROELECTRIC PROJECT
Colombia

CHALLENGE:

A 47° hole with directional drilling (staying within a 50cm radius) had to be achieved for the first time

RESULT:

  • Despite project start delays outside of Master Drilling’s control, the project was completed five months ahead of schedule

SOLUTION:

Master Drilling addressed the following project challenges:

  • Master Drilling embarked on the project, servicing the country’s largest hydroelectric project when it reaches full operation, producing up to 2.4GW
  • The total scope was 2462m (2131m x 4.1 diameter x 90° and 331 m x 2.4 diameter hole with a 47° inclination, drilled with directional drilling)

PROJECT STATS:

Type of drilling type Directional drilling
Machine Use of 4 x 3250  DC drive machines
Excavation depth (m) 1 x 331 m x 47° x 2.4 m diameter  and holes between 127 m x 90° and 80 m x 90° x 4,1 m diameter
Diameter 2,4 diameter and 4,1 diameter
Geology Rock conditions: between poor and good formations.
Project Owner Concorcio Ituango
MINING: LONMIN ROWLAND SHAFT
South Africa

CHALLENGE:

Completion of 4.5m diameter x 985m length at 90º shaft with ground hardness between 200 MPa and 250 MPa. There were a slight deviation of 350mm

RESULT:

  • The project was completed on budget, within stipulated time frames
  • 100% safety record achieved
  • Three local community members formed part of its drilling crew

SOLUTION:

Master Drilling addressed the following project challenges:

  • Work had to continue amid a six-month mine strike
  • Lading had to take place via the funky slide method - this is where rocks are loaded with a winch onto a belt and then carried over into a hopper in order to be transported out of the mine

PROJECT STATS:

MachineRaise boring machine
Excavation depth (m)985m
Diameter4.5m diameter
GeologyHard rock
Project OwnerLonmin
MINING: THE KOLA PROJECT

CHALLENGE:

The client in Russia, had an urgent requirement for the vertical development of 2 ore passes and 2 ventilation raises.

RESULT:

The project was successfully completed in time, despite the impacts of protocols introduced due to Covid-19. The client was very pleased with our operations.  

SOLUTION:

Master Detra used raise boring to drill/bore the 2 ventilation shafts.  Master Detra utilized raise boring technology to excavate the ore passes and ventilation raises.

  • Boring operations were done in 2 uninterrupted shifts per day.
  • Operations were performed on a 24/7 cycle.
  • automatically middle size raise boring rig was used for the operations.
  • A PLC control rig with a hands-free rod handling system was used to improve safety and efficiency.
  • Master Drilling provided raise boring training to Russian specialists for further related projects in Russia.

PROJECT STATS:

MachineMaster Drilling RD3A-250 with hands-free rod handling system
Excavation depth (m)93m to 132m
Diameter2.4 m diameter
GeologyGabbro, solid beds, stable
Project OwnerJSC Kolskaya Mining-and-metallurgical integrated works (subsidiary of PJSC Norilsk Nickel), Severnyy-Glubokyy (North-Deep) Mine, Zapolyarnyy town.