Extension of the Rio underground metro, requiring three new ventilation shafts (two 4.1m in diameter at a depth of 100m, and one 5m in diameter at a depth of 100m)
Our Solution
Master Drilling addressed the following project challenges:
Pilot holes had to be drilled without deviation
Restricted access to site was resolved through the construction of custom-made ramps so that drilling machines could be transported to the appropriate areas
Operating hours were reduced to between 08:00 am and 22:00 pm, and noise levels had to be kept to a minimum as a result of surrounding residential areas
Effective stakeholder engagement with all parties involved and an emphasis on effective environmental management procedures
The Result
Project completed on time, within budget and without deviation
100% safety record achieved during the duration of the project